Photos

20

This Week

0

Defects

2

Client Ready

17

20 photos matching filters

Exterior complete, landscaping finished, ready for handover

Exterior complete, landscaping finished, ready for handover

Landscaping
WA
Hallway with timber flooring laid and painted walls

Unit A | hallway

Hallway with timber flooring laid and painted walls

Finishing
WA
Master bedroom Unit A, carpet laid, wardrobe doors installed

Unit A | bedroom

Master bedroom Unit A, carpet laid, wardrobe doors installed

Finishing
WA
Living area painting and flooring complete

Unit A | living

Living area painting and flooring complete

Finishing
WA
Kitchen fully installed with appliances and splashback

Unit A | kitchen

Kitchen fully installed with appliances and splashback

Finishing
WA
Bathroom fit-off complete, vanity and mirror installed

Unit A | bathroom

Bathroom fit-off complete, vanity and mirror installed

Finishing
WA
Water staining on ceiling below Unit B bathroom, possible waterproofing failure

Unit B | bathroom

Water staining on ceiling below Unit B bathroom, possible waterproofing failure

Fit-Off
MAJOR
Kitchen cabinets and stone benchtop installed Unit A

Unit A | kitchen

Kitchen cabinets and stone benchtop installed Unit A

Fit-Off
WA
Interior painting complete Unit A living area, white walls

Unit A | living

Interior painting complete Unit A living area, white walls

Finishing
WA
Cracked tile near shower drain, needs replacement

Unit A | bathroom

Cracked tile near shower drain, needs replacement

Fit-Off
DEFECT
Floor tiles laid in Unit A ensuite, grouting in progress

Unit A | ensuite

Floor tiles laid in Unit A ensuite, grouting in progress

Fit-Off
WA
External cladding and windows installed, scaffolding still up

External cladding and windows installed, scaffolding still up

Lock-Up
WA
Switchboard installed and wired, meter box ready

Unit A

Switchboard installed and wired, meter box ready

Rough-In
WA
Roof tiles installed, ridge capping complete

Roof tiles installed, ridge capping complete

Lock-Up
WA
Electrical rough-in wiring through wall cavities

Unit A | kitchen

Electrical rough-in wiring through wall cavities

Rough-In
WA
Plumbing rough-in complete, all pipes capped and pressure tested

Unit A | ensuite

Plumbing rough-in complete, all pipes capped and pressure tested

Rough-In
WA
Scaffolding erected around building for upper floor work

Scaffolding erected around building for upper floor work

Lock-Up
WA
Copper pipe rough-in Unit A bathroom, hot and cold lines capped

Unit A | bathroom

Copper pipe rough-in Unit A bathroom, hot and cold lines capped

Rough-In
WA
Unit B framing complete, ready for roof

Unit B | living

Unit B framing complete, ready for roof

Framing
WA
Wall frames up for Unit A, roof trusses being installed

Unit A | living

Wall frames up for Unit A, roof trusses being installed

Framing
WA