Exterior complete, landscaping finished, ready for handover

Unit A | living
Living area painting and flooring complete

Unit A | bedroom
Master bedroom Unit A, carpet laid, wardrobe doors installed

Unit A | hallway
Hallway with timber flooring laid and painted walls

Unit A | bathroom
Bathroom fit-off complete, vanity and mirror installed

Unit A | kitchen
Kitchen fully installed with appliances and splashback

Unit B | bathroom
Water staining on ceiling below Unit B bathroom, possible waterproofing failure

Unit A | kitchen
Kitchen cabinets and stone benchtop installed Unit A

Unit A | living
Interior painting complete Unit A living area, white walls

Unit A | bathroom
Cracked tile near shower drain, needs replacement

Unit A | ensuite
Floor tiles laid in Unit A ensuite, grouting in progress

External cladding and windows installed, scaffolding still up

Unit A
Switchboard installed and wired, meter box ready

Roof tiles installed, ridge capping complete

Unit A | kitchen
Electrical rough-in wiring through wall cavities

Unit A | ensuite
Plumbing rough-in complete, all pipes capped and pressure tested

Scaffolding erected around building for upper floor work

Unit A | bathroom
Copper pipe rough-in Unit A bathroom, hot and cold lines capped

Unit B | living
Unit B framing complete, ready for roof

Unit A | living
Wall frames up for Unit A, roof trusses being installed

Unit A | laundry
Laundry plumbing rough-in, washing machine and trough connections

Unit A | ensuite
Waterproofing membrane applied to ensuite floor and walls

Unit A | living
Wall insulation batts being installed in external walls

Framing started, ground floor walls going up

Slab cured and stripped, ready for framing

Concrete slab pour in progress, pump truck on site